Town of Plainville – WMC designed and oversaw construction of the replacement of the Stillwell Road Bridge. The project features precast concrete box culverts with form liner fascias. The boxes are set at a high skew angle allowing the relocation of the stream back to its original location. The project was in an environmentally sensitive area and feature root wad habitat replacement in the stream. The project was completed in 2012.