Burlington, Connecticut – WMC designed two miles of greenway for the town, a section of the Farmington Valley Greenway along the banks of the Farmington River and all of which was funded through the ISTEA/TEA-21/SAFETEA grant program and all meeting AASHTO standards and requirements.