DEEP Bashan Lake Dam – Originally constructed in the 1800’s, this dam required a new concrete liner on the upstream face to eliminate leaking and structural buttressing of the old stone masonry downstream face, as well as a new low level outlet system and a new spillway. An access bridge over the spillway was also added for maintenance and recreational access.