Moodus Reservoir Dam
Moodus Reservoir Dam – This historic dam rehabilitation project was performed for the Connecticut DEEP.
Harwinton Lake Dam
Harwinton Lake Dam – To update this aging earthen embankment dam which had been under a DEEP repair order for several years, a completely new bridge and main spillway were installed, as well as a new low level outlet and increased spillway capacity using multiple precast culverts and articulated block slope protection. Since the dam […]
Bashan Lake Dam
DEEP Bashan Lake Dam – Originally constructed in the 1800’s, this dam required a new concrete liner on the upstream face to eliminate leaking and structural buttressing of the old stone masonry downstream face, as well as a new low level outlet system and a new spillway. An access bridge over the spillway was also […]