greenways and multi-use trails
Farmington Valley Greenway, Burlington
Burlington, Connecticut – WMC designed two miles of greenway for the town, a section of the Farmington Valley Greenway along the banks of the Farmington
Salmon Brook, Farmington Valley Greenway
Town of East Granby – WMC has designed three greenway/multi-use trail bridges utilizing old railroad bridges and abutments for the Town. This multi-span bridge is
Farmington Valley Greenway
Town of Farmington – WMC designed reconstruction of 2 miles of River Road along the banks of the scenic Farmington River including several small bridges
Sue Grossman Still River Greenway
Town of Winchester – WMC designed over six miles of the Sue Grossman Still River Greenway project which is located on an old railroad bed
South Main Street Reconstruction
Town of Plymouth – WMC has designed the reconstruction of South Main Street for the town. This project was an STP project that was recently
Country Club Road Reconstruction Project
Town of Avon – WMC performed design and construction inspection services for the Town on the Country Club Road Reconstruction Project, an STP funded project