Main Street Bridge

Town of North Stonington – WMC designed and oversaw construction of the replacement of the Main Street Bridge which had washed out in a tropical storm. The old bridge was historic and WMC was able to salvage most of the stone from the old bridge and they were cut and re-installed on the fascia of the new bridge. The project was funded through FEMA.