Projects
Main Street Bridge
Town of North Stonington – WMC designed and oversaw construction of the replacement of the Main Street Bridge which had washed out in a tropical
Hickok Road Bridge
Town of New Canaan – WMC has designed and over seen construction of several bridges for New Canaan, two funded under the DOT Federal Local
Farmington Avenue Bridge
Town of Berlin – Farmington Avenue bridge over the Sebethe River is a precast Tee (NEXT) Beam superstructure founded on steel H Piles. The bridge
Shore Road Bridge
Town of Greenwich – The Shore Road bridge, is an historic arch on the main access for hauling boats to shore area marinas. Rather than
Country Club Road Reconstruction Project
Town of Avon – WMC performed design and construction inspection services for the Town on the Country Club Road Reconstruction Project, an STP funded project
South Main Street Reconstruction
Town of Plymouth – WMC has designed the reconstruction of South Main Street for the town. This project was an STP project that was recently
Sue Grossman Still River Greenway
Town of Winchester – WMC designed over six miles of the Sue Grossman Still River Greenway project which is located on an old railroad bed
Farmington Valley Greenway
Town of Farmington – WMC designed reconstruction of 2 miles of River Road along the banks of the scenic Farmington River including several small bridges
Salmon Brook, Farmington Valley Greenway
Town of East Granby – WMC has designed three greenway/multi-use trail bridges utilizing old railroad bridges and abutments for the Town. This multi-span bridge is
Farmington Valley Greenway, Burlington
Burlington, Connecticut – WMC designed two miles of greenway for the town, a section of the Farmington Valley Greenway along the banks of the Farmington
Bashan Lake Dam
DEEP Bashan Lake Dam – Originally constructed in the 1800’s, this dam required a new concrete liner on the upstream face to eliminate leaking and
Harwinton Lake Dam
Harwinton Lake Dam – To update this aging earthen embankment dam which had been under a DEEP repair order for several years, a completely new
Moodus Reservoir Dam
Moodus Reservoir Dam – This historic dam rehabilitation project was performed for the Connecticut DEEP.
Foster Street, Strong Road, West Road and Avery Street
Town of South Windsor – WMC has performed the design of drainage and roadway projects for the Town on Foster Street, Strong Road, West Road
Sidewalk inspections, Granby
Town of Granby – WMC was retained by the Town to perform construction administration and inspection of over a half a mile of sidewalk. The
Jerome Avenue Road inspection
Town of Burlington – WMC was retained by the Town to design and perform construction administration and inspection of over a half a mile of
Waterbury Road, Bristol
City of Bristol – Waterbury Road reconstruction was a challenging project due to severe vertical and horizontal alignment concerns.
Construction and Engineering projects, Winsted
City of Winsted – WMC has performed services for Winsted for over 30 years including design of 5 bridges, dam inspections and design, stormwater sampling,